Piston rod

Notes:

Start 19.02.2005 – 1,5 hours – Marking, drilling, rubbing, cutting to length
20.02.2005 – 1 hour work on the first connecting rod

Base material; Sheet metal strips

Marking, graining

Ream the hole to the specified dimension using a reamer

20.02.2005 – Feilen der ersten Pleuelstange

26.02.2005 – Filing of the second connecting rod – 1 hour

Leave a Reply

Your email address will not be published.