Bearing block

Notes: Marking, drilling, tapping Start 26.02.2005 – 1.5 hours Starting material: aluminum block drilling for the slide bearing guides Drill holes incl. Threads for mounting the bearing block

Piston rod

Notes: Start 19.02.2005 – 1,5 hours – Marking, drilling, rubbing, cutting to length 20.02.2005 – 1 hour work on the first connecting rod Base material; Sheet metal strips Marking, graining Ream the hole to the specified dimension using a reamer … Continue reading